04/18/2007
Homepage December 2011
Last update on 13 - Jan - 2012
(2 pictures added)
BUILDING AND SAILING A 14 METER CATAMARAN
IN 137 PICTURES
(and 7,000+ hours work...)

Two parallel junk sails
2011 SUMMER CRUISE

APATIKI at Bonifacio - Corsica
On the hard at Messolonghi - October 2011
Testing new battens (without hinges)
Curved sail for better windward ability
End of the day at Messolonghi - Greece

On the water again in April 2011
(photo by Rémy)
Cynthia
Jean-Paul

The cockpit bubble.
(photo by Kobra Luna)
The cockpit bubble at anchor
Waiting for Lefkas bridge to open
Stromboli (active Volcano)
Ventotene

From France to Greece
Setting the port sail
(photo Kobra Luna)
Plenty of space on deck for maneuvering
(photo Kobra Luna)
2010 / 2011 WINTER WORKS
Our cabin
Reinforced masts
Reinforced masts in place
New mast heads
Junk sail with hinged battens
The boarding ramp
Jean-Paul in the doghouse
The galley in the doghouse
New power panel in the doghouse
New house battery bank

House battery bank circuit diagram
2009 - FIRST SUMMER CRUISE

Corsica
Cynthia at Porquerolles
Jean-Paul tuning the sails
Arnaud, the freindly mechanic who tuned the generator.
Amandine
Paul-Emmanuel on the boarding ramp
bla bla bla...
Alice and Jean-Paul

Escape hatches

Ready for the 2009 summer cruise
2008 and 2009
EQUIPMENT and LAUNCH
Testing the sails

Adjusting the lines

Reefing test

Organizing the junk rig lines in the cockpit

Testing the motors with force 6 to 8
(photo by Rémy)

Building the cockpit arches

"Private" pontoon near the sea container

APATIKI is floating

First step on APATIKI

First time on the water

Testing the piano position on board

First version of the office in the port hull

Electric motor (Mastervolt)

Positioning the electric motor

Connecting the batteries

Electric motor battery bank
Painting

Building the doghouse

Experimenting the beam lashing technique

Masts up for the first time
(photo Sylviane)

Working in the sea container

Steering position

Sikaflex on the rope hinges
Placing hatches

Horse riding

Understanding the generator

Workshop in a sea container

The building team

Our temporary home during 9 months at Port-Napoléon

Home sold

Re-assembling APATIKI

Hulls aligned

Jean-Paul slipped from the ladder

Moving the hulls to France
(near Marseille)

From Brussels to Port-Saint-Louis-du-Rhône

Moving the hulls out of the garden
2007 - CENTER DECK
Near Brussels, in our backyard,
with the children.

Hulls and deck completed

Slatted deck

Slatted deck between beam 1 and beam 3

Gluing the tillers

Lockers

Progress report

Sanding the lockers

Very poor weather conditions during the whole summer

Dust

On the fore beam

Beams in place

Beam landed

Landing a beam

Lifting a beam alone

Alice

Beam movers

Beam ready for coating

Flat floor

Plywood delivery

Working "at home"

Ready for the 2007 season
2006 - PORT HULL
With APIDES and summer students.

Painting

Epoxy fillets

Sanding again

Fairing

Short break

Glassing

Final sanding before glass cloth

Hull ready for glassing

Gluing foam

Epoxy delivery

Sandwich deck

Gunwale

Beam trough

Level or not level ?

Aligning the hulls

Upper panels

Upper bulkheads and upper stringers

Turning the hull

Sanding

Glassing

Placing the stringers

Bulkheads

Gluing the keel

Softwood delivery

Shed ready for the 2006 building season (port hull)

Building plans and guide
2004 and 2005 - STARBOARD HULL
With the children and nepfews

October 2005 - Starboard hull completed

Final coat

Sanding

Fairing mix prepared by Alice

Paul-Emmanuel saturating glass cloth

Beam trough partially glued

Inside the hull

2004 / 2005 winter under tarpaulin

Charles removing excess epoxy

Lower hull just turned

First experiences with glass cloth

Big fish

After two weeks, Cynthia on the keel

Drawing lines on the keel

First wood delivery.
Difficult to imagine a catamaran !

April 2004 - Building the temporary shed in the garden.